![]() The professionally-recorded show features tracks as performed on The Wild Life tour. Mastered specifically for vinyl by Maor Appelbaum (Dream Theater, Faith No More)Ī complete, never-before released live recording from October 1992. Two 33RPM, half-speed-mastered LPs on red & white opaque vinyl Slaughter's 1992 record presented on vinyl for the first time since its initial releaseĪudio taken from the band's original analog masters Thanks in advance for your support and patience. Slaughter - The wild life 1992/Remastered 2003 Driver - Sons of thunder 2008 Message - Fine line 1998 Dream Evil - Gold medal in metal (Alive & Archive). We will keep you updated on progress via social media and email. Due to the current vinyl pressing backlog and supply chain issues, this preorder may not be ready for up to 12 months. No visable scratches.
Buy with CONFIDENCE, I have GREAT Feedback Maintaining current condition and limited budget scenarios would increase both the backlog and the total cost of maintenance and repairs over the analysis period.**PLEASE NOTE - This is a preorder item. The unlimited budget seems though ideal, it does not improve pavement condition. Results show that the backlog elimination budget would be the best scenario because it increases the pavement condition and eliminates the backlog of major maintenance and repairs over the five-year period. An analysis of five budget scenarios was conducted for a five-year plan using the critical pavement condition index (PCI) method (ASTM D6433). Maintenance and repair (M&R) planning analysis was also performed in order to determine the most cost-effective treatment and suggest the optimum utilization of funds for the city. The study used the City of Chattanooga pavement database to create the current and future pavement conditions. The University of Tennessee at Chattanooga utilized Micropaver software as PMS tool to conduct a pavement management analysis of principal arterials in the City of Chattanooga. Pavement Management System (PMS) has demonstrated to be an essential tool for proper management of infrastructure and proper utilization of available funds. Many transportation agencies lack sufficient funds to maintain and repair roads, which results into increased pavement maintenance cost. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |